Historia zmian

Autor SHA1 Wiadomość Data
  Rob Figueiredo 78f5232d84 Add Schedule.Next() to find the next actiation time. Separate schedule methods from spec parsing functions. Change cron activation tests to a test of Next() 13 lat temu
  Rob Figueiredo f16e0d5188 Add seconds, N/step handling, named months/dows, checking activation at a time, a bunch of cron spec tests. 13 lat temu
  Rob Figueiredo 4beaaaea37 Rename entry to schedule. A cron entry can embed the schedule 13 lat temu